2240| 3
|
[论文] 2005 Interim Review of the PWR Primary Water Chemistry Guidelines |
This report documents the biennial review of the Pressurized Water Reactor Primary Water
Chemistry Guidelines (report 1002884, dated 2003) that was performed in 2005 in accordance with the requirements of NEI 97-06, Rev. 1, Steam Generator Program Guidelines, and NEI 03- 08, Guideline for the Management of Materials Issues. The main result of the two-year review was that the Guidelines did not require immediate revision at this time except for issuing interim guidance related to identification of which items in the Guidelines are "mandatory," "shall" requirements, and "recommendations." A draft document providing this interim guidance was developed by the Review Committee, and was subsequently transmitted to the Steam Generator Management Program for review and approval. Modifications to the interim guidance were made during this process, resulting in the interim guidance contained in Chapter 2 of this report which was transmitted to the industry on October 18, 2005. Another result of the two year review was the identification of a significant number of topics that should be further evaluated and considered during the planned 2006/2007 revision of the Guidelines.
购买主题
已有 2 人购买
本主题需向作者支付 2 枚电建币 才能浏览
| |
|
|
小黑屋|手机版|Archiver|电力建设网站 ( 苏ICP备16030970号-1 )|网站地图
GMT+8, 2024-5-9 02:52 , Processed in 0.205151 second(s), 30 queries .
Powered by Discuz! X3.4 Licensed
© 2001-2023 Discuz! Team.